Overview
As part of the redevelopment works on Rue des Scillas et Rangwee in preparation for the extension of the tram line, as well as to improve the mobility infrastructure in this difficult area, large-scale road works are being carried out as of Monday, 4 April 2022. These may cause a number of changes to traffic and public transport (AVL line 5).
AVL line 5
Line 5 buses travelling in both directions between Rangwee and Cloche d'Or will be diverted via the Rond-point Gluck and Boulevard de Kockelscheuer. Line 5 buses will no longer call at the "Howald-Moureschanz", "Howald-Ronnebësch", "Howald-P+R Lux-Sud" and "Gerhard Mercator" stops. Instead of line 5, lines 28 and 29 will serve the Howald commercial zone and Cloche d'Or. Once Rue des Scillas is reopened to traffic, the "Howald, Moureschanz" stop will be permanently closed.