02.04.2025
Transport
Route barré pour travaux

Roadworks will be carried out on Rue de Trèves from 5:00 on Monday, 7 April to 5:00 on Tuesday, 22 April 2025.

Owing to the works, traffic will be adapted as follows:

  • Rue de Trèves will be closed to all traffic except cyclists between Rue Munster and Rue de la Tour Jacob;  

  • Rue du Rham will be closed to through traffic, except for cyclists. 

Please note that these works will be postponed in the event of bad weather.

Public transport will also be affected as follows:

  • line 23 buses operating between the Gare district and Clausen will be diverted via Pulvermuhl-Fetschenhof in both directions. The "Stadgronn, Bréck" stop will not be served;  

  • a shuttle bus will serve the Grund district every 30 minutes.