Project description
The City of Luxembourg will be carrying out redevelopment work in Rue de Mühlenbach and Rue Albert Unden.
The work will be carried out in collaboration with the following departments:
- VDL – Service Voirie (Department of Streets): Building of a cycle lane in Rue Mühlenbach. Road and pavement alterations in Rue Mühlenbach and Rue Albert Unden. Upgrade of pedestrian crossing and bus stops with tactile ground surface indicators for people with reduced mobility to bring them into compliance with existing requirements.
- VDL – Service Eaux (Water Department): Upgrade of water mains in Rue Mühlenbach. Replacement of deteriorated connections and upgrade of existing connections to bring them into compliance with existing requirements.
- VDL – Service Éclairage public (Public Lighting Department): Upgrade of public lighting and electronic communication equipment cabinets; installation of additional lighting at pedestrian crossings.
- VDL – Circulation (Traffic Department): Upgrade of traffic lights to bring them into compliance with existing requirements.
- VDL – TIC (ICT Department): Upgrade of the City's fibre optic network. Extension of the City's Wi-Fi network.
- Creos Luxembourg SA Electricité: Replacement of the deteriorated low voltage (220V) network. Laying of backup conduits. Connections for future buildings and upgrade of non-compliant or deteriorated home connections.
- Creos Luxembourg SA Gaz: Upgrade of deteriorated gas mains and connections.
- Post Luxembourg: Rollout and extension of the very high speed fibre optic network.
Works schedule
Commencement of work: September 2023
Expected duration of the works: 280 working days
Planned completion: July 2025
Traffic information
What is the current traffic situation?
For vehicular traffic
The affected sections of road will be gradually closed off to traffic as the project progresses. Rue Mühlenbach is currently a two-way thoroughfare and traffic will occasionally be regulated by traffic lights.
Pedestrian access and access for emergency services will be maintained throughout the duration of the works. Vehicular access to private property will be maintained for as long as is technically possible.
For businesses and deliveries
The City of Luxembourg will do its best to ensure access for deliveries to local businesses throughout the duration of the works.
Changes to traffic flows will be implemented as the works progress. Appropriate signage will be put in place by the Service Circulation (Traffic Depatment). The City of Luxembourg thanks local residents, businesses and road users for their understanding and regrets any inconvenience that the works may cause.
For public transport users
Bus routes will remain unchanged. Bus stops will be relocated as and when necessary.
Progress of works
How long will the work take?
Planned completion: July 2025
What work has already been completed?
For phase 1, the laying of dry utility network, water and gas mains has been completed on the odd-number side of Rue de Mühlenbach. On the even-number side, the laying of water and gas mains has also been completed.
For phase 2, the laying of dry utility network, water and gas mains on the even-number side has also been completed.
What work remains to be done?
For phase 1, on the even-number side of Rue Albert Unden, the contractor is currently laying the dry utility network mains. For phase 2, on the odd-number side, the dry utility network, water and gas mains have yet to be laid.
All superstructure work in Rue Albert Unden and Rue de Mühlenbach.
Your home utility connections
- City department heads and contractors' representatives will visit local residents' homes at some point during the works.
- The condition of local residents' existing connections will be inspected.
- If you wish to have your existing connections replaced, please inform the City's representatives when they visit your home.
If you experience any malfunctions in your gas, water or communication system, please contact the 24-hour hotlines listed below:
- Service Eaux – Tel.: 4796-2883
- Creos Électricité – Tel.: 8002-9900
- Creos Gaz – Tel.: 8007-3001
- Post Luxembourg – Tel.: 8002-8004
- Eltrona – Tel.: 499 466 888
Stay informed
To make life easier for residents while these works are being carried out, the City of Luxembourg has implemented a series of measures, including the option to participate in worksite meetings. Residents affected by the works may participate in these meetings to obtain additional information about the progress of the works, and to air any grievances they may have. Please contact the works coordinator or one of the construction mediators.
Weekly worksite meetings
Worksite meetings will be held on Thursdays at 9:30.
Information meeting
An information meeting for local residents was held on 17 April 2023. A presentation of the works is provided below:
Contacts for these works
Department | Contact | Telephone number |
---|---|---|
VDL – Service Voirie (Department of Streets, Coordinator) | Bob Bremer | 4796-3032 |
VDL – Service Eaux (Water Department) | Tom Wagner | 4796-4334 |
VDL – Service Éclairage public (Public Lighting Department) | Edmundo Lima | 4796-3380 |
VDL – Construction Mediators | chantiers@vdl.lu | 4796-4343 |
VDL – Service Technologies de l'information et de la communication (ICT Department) | Jo Petit | 4796-3838 |
VDL – Service Coordination des chantiers (Work Site Coordination Department) | Laura Sertic | 4796-2803 |
VDL – Service Circulation (Traffic Department) | Roland Roeltgen | 4796-3343 |
Creos Électricité | Bruno Da Silva | 621 792 268 |
CREOS Gaz | Gilles Garganese | 621 888 575 |
Post Technologies | Armand Kruse | 621 191 339 |
EPE – Éclairage étatique (National Lighting) | George Schlimpen | 2846-5617 |